Charlotte Oestervang Photography
To make sure that the right depth and width of the working lane is achieved, the deminer uses his tools to measure his work in the lane. In this task, the deminer excavates the top 20 cm layer of the highly metal contaminated soil

2/13




To make sure that the right depth and width of the working lane is achieved, the deminer uses his tools to measure his work in the lane. In this task, the deminer excavates the top 20 cm layer of the highly metal contaminated soil : Demining in Kabul : Charlotte Oestervang Photography




© Charlotte Oestervang